Engineering Homework Help
Engineering Homework Help. Highway Engineering
This part of the coursework (part 2) is based on the highway infrastructure relating to a new housing development in Leeds. The site is situated on the urban fringes of Whinmoor, approximately 7km north-east of Leeds City centre and a walk of 1.4 miles to the local centre of Seacroft. The site is off the A64 York Road from which the primary access into the site will be taken. The site is triangular in shape and has an overall area of approximately 16 hectares.
The submission will consist of two sections namely:
a)A short report
Addressing the issues in 1 to 3.
b)Drawings.
Drawings for 4-6 above
Drawings
i.Each drawing should be enclosed in a border and have a north point and chainages where applicable.
ii.In the bottom right-hand corner of the drawing there should be a Title block, about 12.5cm by 6cm. This should contain:
Project title
Drawing number
Name of author
Scale
Date
iii.No curves should be drawn free hand.
iv.Drawings should be suitably folded, with the title box showing, and included in the report.